| Prepare necessary documentation for various environmental compliance needs |
B: 165. Prepare necessary documentation for various environmental compliance needs |
|
09/30/2013 |
07/03/2013 |
| Design and Specifications for Klickitat River Floodplain Project (Haul Road) Haul Phase 4 |
C: 175. Design and Specifications for Klickitat River Floodplain Project (Haul Road) Phase 4 |
|
08/31/2013 |
08/31/2013 |
| Construction oversight and EC for the Klickitat River Floodplain Project (Haul Road) Phase 4 |
D: 100. Contruction Oversight for Klickitat River Floodplain Project (Haul Road) - Phase 4 |
|
11/15/2013 |
12/09/2013 |
| Construction Oversight for Upper Klickitat (Phase 3) |
E: 100. Construction Oversight for Upper Klickitat Phase 3 |
|
09/30/2013 |
07/09/2013 |
| Upper Klickitat Phase 3 - Side channel reconnection |
F: 30. Upper Klickitat Phase 3 - side channel reconnection |
|
09/30/2013 |
07/09/2013 |
| Construction oversight for Tepee Creek Meadows - Phase 2 |
G: 100. Construction Oversight for Tepee Creek Meadows Project - Phase 2 |
|
11/15/2013 |
11/04/2013 |
| Reconnection of historic channel, reconfiguration of existing channel, and log jam construction |
H: 29. Tepee Creek Meadow Project (Phase 2) - Floodplain Reconnection |
|
11/15/2013 |
11/06/2013 |
| Design and Specifications for Upper Klickitat (Phase 4) |
I: 175. Design and Specifications for Upper Klickitat Project (Phase 4) |
|
12/15/2013 |
12/15/2013 |
| Construction oversight for Upper Klickitat (Phase 4) |
J: 100. Construction Oversight for Upper Klickitat Project (Phase 4) |
|
03/31/2014 |
|
| Manage Native Nursery |
K: 47. Manage Native Nursery |
|
03/31/2014 |
12/09/2013 |
| Revegetate 4.0 acres |
L: 47. Revegetate Klickitat River Floodplain Restoration (Haul Road) Phase 4 project site |
|
03/31/2014 |
03/28/2014 |
| Revegetate 15 acres |
M: 47. Revegetate Tepee Creek Phase 2 project site |
|
11/15/2013 |
11/05/2013 |
| Revegetate 7 acres |
N: 47. Revegetate Upper Klickitat River Phase 3 and 4 sites |
|
03/31/2014 |
03/28/2014 |
| Invasive Weed Control |
O: 197. Invasive plant control |
|
08/31/2013 |
09/19/2013 |
| Effectiveness monitoring data |
P: 157. Habitat Enhancement Project Monitoring |
|
12/01/2013 |
11/05/2013 |
| Streamflow monitoring data for 5 sites |
Q: 157. Streamflow monitoring |
|
03/31/2014 |
03/28/2014 |
| Summary of continuous stage information |
R: 157. Collect water surface elevation data - Klickitat/Columbia River Confluence |
|
03/31/2014 |
03/28/2014 |
| Turbidity, temperature and stage data for Big Muddy Creek and Klickitat River sites |
S: 157. Measure turbidity timing and duration associated with Big Muddy Creek |
|
03/31/2014 |
03/28/2014 |
| Habitat Assessment |
T: 157. Habitat Assessment |
|
03/31/2014 |
03/28/2014 |
| Conduct Food Web Study on Tepee and White Creeks (Effectiveness Monitoring) |
U: 162. Conduct Food Web Study on Tepee and White Creeks (Effectiveness Monitoring) |
|
03/31/2014 |
03/28/2014 |
| Physical Habitat Data Analysis |
V: 162. Summarize monitoring data |
|
03/31/2014 |
03/28/2014 |
| Attend Technical Meetings |
W: 122. Assist Planning Activities - Technical Review |
|
03/31/2014 |
03/28/2014 |
| Disseminate Results of a KWEP implemented restoration project |
X: 161. Disseminate Klickitat habitat and project information |
|
03/31/2014 |
03/28/2014 |
| Database Management and Development (multiple databases) |
Y: 160. Database Management and Development |
|
03/31/2014 |
03/28/2014 |
| Outreach to Professional Societies |
Z: 99. Project Outreach |
|
03/31/2014 |
03/28/2014 |
| Conduct one appraisal |
AA: 172. Acquire and review appraisal for one parcel |
|
03/31/2014 |
03/28/2014 |
| BPA - preparation of SOW package, submission of accrual estimate, and accurate invoices. SRFB - adm |
AB: 119. BPA and SRFB Project Management and Administration |
|
03/31/2014 |
03/28/2014 |
| Attach 2010 Progress Report in Pisces |
AC: 132. Submit Progress Report for the period (1/1/2010) to (12/31/10) |
|
03/31/2014 |
03/24/2014 |
| Annual report for 2012 attached in Pisces |
AE: 132. Submit Annual Report for the period 1/1/2012 to 12/31/2012 |
|
03/31/2014 |
|
| Collect topographic data via LiDAR for a section of Klickitat River valley bottom |
AF: 157. Old WE "U" - Collect topo data for approx. 20 miles of Klickitat River valley bottom |
|
03/31/2014 |
05/31/2013 |